The New Bridge of Genoa: hot galvanized 350 tons of steel

There is no better way to start again than with the pride of having made our contribution to such an important work for Italy as the bridge over the Polcevera (formerly the Morandi bridge).

Specifically, we have hot-dip galvanized 350 tons of steel, which together made up a tunnel more than a kilometer long, a hidden walkway between the supporting structure and the asphalt.

A big help for the future maintenance of the Genoa Bridge and a great ally for all the control technicians.

Ponte di Genova zincato a caldo
We use cookies to give you the best experience.